Bar Build 006

Finally the post all of you have been wating for. YOu have waited weeks in anticipation, checking this blog daily for the elusive bar build update. You can not wait for work to continue so you can drive upstate for free beer. Today at 9am sharp the electrician came over. We ripped down sheetrock on the wall and on the ceiling. He installed a new switch for the high-hats, ran wire for the outlets.

New high hats, some ripped down the ceiling tho

New high hats, someone ripped down the ceiling tho

 

High Hats

High Hats

Outlet under the counter

Outlet under the counter

White box is washer hook up. Above that, outlet and cable for the TV

White box is washer hook up. Above that, outlet and cable for the TV

Up next is the Kegorator and the plumber.

Advertisements


A good bartender always listens....

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s